Corner Point Construction develops outdoor storage yards across Clearwater & Pinellas County — truck and trailer parking, container storage and equipment laydown, with engineered drainage and durable surfacing.
Request Your Free Site Walk Call 863.270.6288Everything a Clearwater outdoor storage yard needs — from raw land to a surfaced, drained, secured facility.
Clearing, grubbing and demolition to open up a Clearwater parcel for development, with erosion control from day one.
Mass grading to your drainage design, building pads, access and circulation sized for 53' trailers.
Ponds, conveyance and treatment engineered to meet SWFWMD and Pinellas County requirements for large surfaced yards.
Compacted aggregate, asphalt or concrete — or a hybrid — over a properly engineered base built for heavy loads.
Perimeter fencing with code-compliant screening, controlled gated access and site lighting tenants pay for.
Power for lighting and security, plus office/guard building infrastructure where the operation warrants it.
Pinellas County's dense logistics and contractor base, the US-19 and Gulf-to-Bay corridors, and Port Tampa Bay access via the Courtney Campbell and Howard Frankland keep sustained demand for truck parking, trailer storage and equipment yards in Clearwater & Pinellas County.
We build across Clearwater, Largo, Pinellas Park, Oldsmar, and the St. Petersburg Gateway area.
Surfaced yards trigger detention and treatment under SWFWMD Environmental Resource Permitting, coordinated with Pinellas County.
Corner Point Construction is a licensed Florida general contractor. Permitting requirements vary by jurisdiction and water management district. This is general information, not engineering or legal advice — confirm specifics with the local authority and a licensed engineer.
A free site walk and budget-level assessment so your pro forma reflects the dirt, not a national average.
We work with your civil engineer on grading, drainage and surfacing as one coordinated plan.
Clearing, grading, stormwater, surfacing, fencing and finishing — executed on schedule.
Get a candid read on feasibility, cost drivers, and what it would take to build — no obligation.
Request Your Free Site Walk